My boss asked me to calculate a beam, to know if it can support some stuff... We already know it can, cause another machine was put in another beam next to this one, and they are identical...
Still, he asked me, but he didnt give me almost any info, specially the type of beam... After a lot of asking, he finally got me the blueprints and got the beam type... and saw that it was actually 2 beams, but he told me that it wasnt actually like that, so i did the math like how he said...
I donnt know much how to do this stuff. I know the basics, which are enough for this problem, but idk how to use programs or anything for this stuff.
Now, he sends me photos... And its exactly as the blueprints said. Not only that, there is another beam that may or may not be in the blueprints, but i cant know cause i only got half of them... And to me, it looks like the beams I had to calculate dont really matter, and the important one is the new beam and its much more difficult to calculate.
I really dont care about what i have to do, but I do care about BEING ABLE to do it. I hate this half state between doing it and not having enough info to do it. I just want to finish it. I have been days at it to remember how its done, but never had enough info anywya... And now, that I finished everything, he sends me the pics contradicting everything... It just stresses me out.
I have more work to do, but I cant be changing topics every five minutes. In fact, I already do that and it leads to a lot of stress and mistakes. I already did mistakes in other works because of exactly this. I had to do some electrical calculations and mid project my boss asked me for a different set of electrical calculations, but I use the same excel template... So while I didnt mix them up, the first one I was doing, I left them half completed... and sent them like that without noticing...
And Im here, just waiting for my boss to call me to sort this **** situation... He sent me the pics more than an hour ago...
Still, he asked me, but he didnt give me almost any info, specially the type of beam... After a lot of asking, he finally got me the blueprints and got the beam type... and saw that it was actually 2 beams, but he told me that it wasnt actually like that, so i did the math like how he said...
I donnt know much how to do this stuff. I know the basics, which are enough for this problem, but idk how to use programs or anything for this stuff.
Now, he sends me photos... And its exactly as the blueprints said. Not only that, there is another beam that may or may not be in the blueprints, but i cant know cause i only got half of them... And to me, it looks like the beams I had to calculate dont really matter, and the important one is the new beam and its much more difficult to calculate.
I really dont care about what i have to do, but I do care about BEING ABLE to do it. I hate this half state between doing it and not having enough info to do it. I just want to finish it. I have been days at it to remember how its done, but never had enough info anywya... And now, that I finished everything, he sends me the pics contradicting everything... It just stresses me out.
I have more work to do, but I cant be changing topics every five minutes. In fact, I already do that and it leads to a lot of stress and mistakes. I already did mistakes in other works because of exactly this. I had to do some electrical calculations and mid project my boss asked me for a different set of electrical calculations, but I use the same excel template... So while I didnt mix them up, the first one I was doing, I left them half completed... and sent them like that without noticing...
And Im here, just waiting for my boss to call me to sort this **** situation... He sent me the pics more than an hour ago...